Western Sydney University - ARA Electrical
10/09/2018

Project: Dovecote Luxury Accommodation Location: Gerringong, South Coast NSW ARA Electrical trading as Transelect carried out the Level 3 Design & Level 1 Construction for new power supply to Dovecote, a brand new luxury accommodation situated between Gerringong and Kiama. The project required careful consideration of the property’s aesthetics. Consequently, Transelect ensured that the positioning of new above-ground […]
Read More

ARA Electrical - Nan Tien Temple and Institute
06/07/2018

ARA Electrical recently completed works for the Nan Tien Temple and Nan Tien Institute (NTI) in Unanderra, south of Wollongong. The Nan Tien Institute opened in 2015 and attracts local and international students. It is situated across from the Nan Tien Temple, which is the largest Buddhist temple in the Southern Hemisphere. The International Buddhist […]
Read More

04/10/2017

This project entailed the complete survey and detail design of the existing feeder and ground conditions on Transport for NSW rail easement. ARAHV (Transelect) scope was to obtain approval of design from Sydney Trains Procurement of specialised Sydney Trains specified materials, Co-ordination of outages with Sydney Trains, installation of poles and augmentation of the new […]
Read More

27/09/2017

ARA Electrical High Voltage Services Pty Ltd trading as Transelect were engaged as the Principle Contractor for this project and provided strategic infrastructure upgrade works associated with the installation of a new power supply facility at Gujarat NRE’s Wongawilli colliery. Work included management, consultancy, coordination, design and construction of a new dedicated 35MVA rated, 33kV […]
Read More

27/09/2017

ARAHV (Transelect) scope was to co ordinate and carry out construction works as per 33kv and 11 kv design from Endeavour Energy. Two new 33KV feeders from West Tomerong TS to supply Tomerong ZS , also three new 33KV feeders to supply Huskisson ZS, Sussex Inlet ZS and Yatte Yatte ZS . Outgoing 11KV feeders […]
Read More

27/09/2017

ARAHV (Transelect) are carrying out the Management and Maintenance of Jervis Bay Territory high voltage network. Management activities consist of development of a site safety management plan, asset management plan, operating protocol and  updating of single line diagrams. Routine maintenance inspections consist of HV substation transformers, HV & LV substation switchgear, thermal imaging of HV […]
Read More

27/09/2017

This Grosvenor Project entailed the construction of a new underground coal mine (Longwall and Continuous Miner Operations), with associated material handling facilities, infrastructure and utilities on the surface, and also included brownfield modifications to the existing MNM Coal Handling and Preparation Plant (CHPP) infrastructure to increase the coal production rates for both MNM and Grosvenor […]
Read More

27/09/2017

Joe White Maltings is firmly established as Australia’s largest malting company and is part of Viterra Limited, one of Australia’s leading agri-businesses. The Sydney Malting Project includes development of a malt plant with an annual capacity of 110,000 tonnes, a 120,000 tonne per annum grain and associated products handling plant; cleaning facilities; and a bulk […]
Read More

27/09/2017

ARAE carried out all electrical work including the detail design, fabrication of switchboards and control panels, factory testing, supply, delivery, installation, connection, testing and precommissioning and assistance during commissioning of all electrical works associated with the new Grain Terminal. This included the LV power distribution system, automation and control system, all instrumentation and field devices, […]
Read More

27/09/2017

CENTRAL THERMAL PLANT $936,835 Supply 8 x 4000A Main Switchboards with Interlocking Bus-tie Connections. The Project also required the supply of nine Motor Control Centres for control of Auxiliary Systems. METRONODE $380,145 Supply 3 x 1600A Main Switchboards with Automatic Transfer Switches. These boards fuel & control a complex system which enables a Dual Redundancy […]
Read More

27/09/2017

This project entailed both the network and private augmentation which included the relocation of 5km of Ausgrid 11kV overhead power line and reclaiming of the redundant powerline. Installation of private internal powerlines including, 8km of 66/22kV composite powerline on both steel & timber poles, supply & installation of 3 x 22kV pole mount substations, 22kV […]
Read More

08/12/2015

In April 2014, ARA Electrical Engineering Services Ingleburn completed one of their largest projects to date. ARA Electrical Engineering Services provided the electrical infrastructure for a retail meat processing and distribution facility. Working with CIP Constructions, ARA Electrical Engineering Services outfitted the 20,000m2 facility with new custom manufactured main switchboards, new distribution boards, and internal […]
Read More

08/12/2015

ARA Electrical Engineering Unanderra, formerly Bass Electrical, have been recognised for their work at the recently completed Port Kembla Grinding Mill. The company have claimed the 2014 NECA Excellence Award in the ‘Industrial Project – Large’ category for the comprehensive electrical package that they installed at the grinding mill. This is the second time that […]
Read More

17/11/2015

Completed in July 2015, the Central Thermal Plant (CTP) construction was a success from the get-go. As part of the project team, ARA Electrical was engaged to design, install, manufacture, construct and provide electrical services to the award-winning trigeneration plant at Sydney’s Central Park precinct in Chippendale, NSW. The project required the construction of a new two-level basement plant, […]
Read More

17/11/2015

ARAHV were engaged by Glencore Coal  to carry out the Bulga Optimisation Project which included All site survey, set out and detailed design for both the Ausgrid and private packages. ARAHV were responsible for the Construction of access tracks and tree clearing and the Relocation of 5.5kM of Ausgrid 66kV Power Line including reclaiming of redundant […]
Read More